API Case Study

2 Room fully anechoic chamber DEF standard 59-411 and MIL Standard 461G 7m x 3.6m x 3.6m.

Project Details

Client: API
Location: Worcester, UK
Job Specification: Remove old EMC chamber and design, build and install new 2 room fully anechoic chamber DEF standard 59-411 and MIL Standard 461G 7m x 3.6m x 3.6m to include:

The Challenge


This project used a combination of new Ferrite which uses the latest technology and is a leap forward in return loss performance. This was combined with the use of Global EMC’s new Hybrid Pyramidal absorbers which are better quality with better test results and overall better chamber performance.

  • Test room 4.6m x 3.6m x 3.6m
  • Control room 2.5m x 3.6m x 3m
Enquire Now
Made in Britain logo

British craftsmanship

Associated with high quality standards, attention to detail, and innovation, British craftsmanship is a preferred choice for many due to the reputation for precision and accuracy required in meeting the most challenging EMC standards and shielding environments. Global EMC from our purpose-built production facility in Nottinghamshire, UK, prides itself on these principles and is a company who builds trust and confidence with its customers. We are proud to be associated with being “Made in Britain”.

sine waves sine waves sine waves